I am searching for an cost optimization algoritm to optimize a schedule on when to run the SPA/Jacuzzi heater and pumps, water boiler , heating etc based on day a head energy prices and peak load.
“slow loads” that have to run a number of hours a day but not nessesary continiuosly can be splittet into several timeslots
any one that have a suggestion for a good solution ?
1 post - 1 participant